Around The Plant @ WSI |
|
|
|
This is “Wild Bill”. He is Welding
Neck Assemblies for the Drop Deck Trailer line. |
|
|
Floor installation for Drop Deck
poultry trailer. This worker is screw drilling the hard wood floor to frame
of trailer. |
|
|
This Drop Deck trailer has been
placed into the “Rotator” and rotated to
the “Upright Position” |
|
|
As you can see, This trailer has been
placed in the “Rotator“. This machine will rotate a trailer frame 180
Degrees. This operation serves 2 purposes.
|
|
|
Welding Line 1. Jeffery and Rebbecca do additional welding to this trailer frame
while still loaded into the “Rotator”. |
|
|
This is the beginning of Welding Line
1. This Worker is finishing up a Beam Assembly for a Flat Bed trailer. |
|
|
Midway of Welding Line 1. This worker
is installing neck doublers, fifth wheel plate assembly and web stiffeners.
The through frame Jr. I-beams will be installed at this point too but not
shown here. See picture below. |
|
|
Midway of Welding Line 1. Here at
this stage, the crew installs the suspension system, cross members and frame
stiffeners. On this particular trailer as you can see, an air ride dual
tandem suspension was installed. If you look close, you can see that the “Jr I-Beams” have been placed into their beam slots. |
|
|
Our new up draft paint booth. Worker
applies first coat of primer. |
|
|
Working in “The Pit” Applying first
coat of red. |
|
|
Spraying those tight spots. Doing a
great job for our customers. Then off to the curing oven. |
|
|
Day to day operations @ WSI. |
|
|
|
|
Copyright © 2007 Wade Services Incorporated. All rights
reserved. |
|